For Developers & Owner’s Reps

One contract.
Fixed scope.

Low-voltage is the last scope to be defined and the first to blow up timelines. We lock BoQ, exclusions, and dependencies before the first cable is pulled — so your project finishes on time and on budget.

01 / Why Now

Low-voltage surfaces last —
and blows up budgets first.

01

Scope Creep Kills Margins

Without a frozen BoQ, every AV/IT change request becomes a negotiation at the worst possible moment — when you’re racing to handover.

02

One Contract, One Responsibility

Instead of coordinating 5 vendors across audio, network, CCTV, control, and lighting — you get one integrated scope, one contact point, one accountability line.

03

Compliance Is Not Optional

PDP Law (UU 27/2022) requires compliant CCTV with proper data handling — fines reach 2% of annual revenue. Wi-Fi 6E is now baseline for premium properties.

02 / What You Get

Scope Freeze
deliverables.

New build or renovation, scope control is the difference between margin and loss. A Scope Freeze works the same way — audit, define the upgrade, lock the BoQ.

01

Locked BoQ with line-item specs and alternatives

02

Exclusions and assumptions document

03

Integration map: network, audio, video, security, control

04

Cable route and conduit requirements for GC

05

Timeline and dependency checklist (what’s needed from GC and when)

06

Budget range by tier: Good / Better / Best

03 / How We Solve It

How we protect
your margin.

01

Scope Lock

Conduit provisions, power requirements, cable routes, and a fixed BoQ — all defined before walls close. The number you approved is the number you pay.

02

Single-Contract Coordination

Audio, network, CCTV, lighting, control — one coordinated scope, one contract, one point of accountability. Not five vendors pointing fingers.

03

On-Time Handover

As-built documentation, commissioning reports, staff training — delivered on your timeline. AV/IT delay means opening delay. We don’t let that happen.

05 / Common Questions

Questions from developers.

We’ll figure out AV after construction.
That’s when it gets expensive. Conduit, power, and structural provisions need to happen during build. Post-construction integration typically costs 3–5× more in rework alone.
We have a main contractor who handles everything.
We often work under GCs. One contract to them, they pass our scope through. This keeps your procurement simple while ensuring the low-voltage work gets specialist engineering.
Timeline is too tight for a design phase.
We’ve hit aggressive timelines before. A Design Audit typically takes 1–2 weeks. Without it, you’ll spend longer on change orders later. Let’s map the critical path and see what’s realistic.

Lock your scope
before you break ground.

We assess your project, identify the low-voltage scope, and propose a Scope Freeze package. No charge to talk through what’s real.